Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Red Trail Spur

 3.0 (4)

1.1 Miles 1.7 Kilometers


Singletrack

54' 16 m

Ascent

-77' -24 m

Descent

2%

Avg Grade (1°)

7%

Max Grade (4°)

978' 298 m

High

928' 283 m

Low

Shared By ESG Greene

Conditions


All Clear 1 day ago
Dry - Watch out for Sasquatch, it's mating season! History

Getting forecast...

A fun trail that brings some extra challenges to a ride at the Royalview singletrack trail system.

ESG Greene

Dogs Unknown

Features -none-

Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens. The clay rich soil sticks to your tires so well it's impossible to ride through anyway. Trails are also one way. There are many rumors of rangers handing out tickets for violations to both of these rules. Check here for the latest updates.

Description

A worthwhile spur to add some length to the Royalview Red Trail.

It is 1.9 miles return and is worth the trip is you are looking for a little extra challenge.

There are about 10 or so stunts spread out along this path, mostly towards the loop part. They include skinnies less than a foot off of the ground, a rock dropoff with an optional skinny ride off, and a couple of other built stunts. These are mostly good quality and they all have easier ways around them.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 4 votes

#13843

Overall
  3.0 from 4 votes
5 Star
0%
4 Star
50%
3 Star
25%
2 Star
0%
1 Star
25%
Rankings

#159

in Ohio

#13,843

Overall
7 Views Last Month
2,050 Since May 17, 2013
Intermediate Intermediate

0%
50%
25%
25%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter