Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Chochenyo Trail

 2.0 (1)

1.3 Miles 2.1 Kilometers


Doubletrack

7' 2 m

Ascent

-7' -2 m

Descent

0%

Avg Grade (0°)

1%

Max Grade (1°)

13' 4 m

High

7' 2 m

Low

Shared By Bob Gardner

Conditions


Unknown

Getting forecast...

The longest trail through the marshlands connects with several shorter trails in the network.

Bob Gardner

Dogs Unknown

Features -none-

Family Friendly Fun, easy ride for kids, close to visitor center, with several loop options and lots of birds.

Description

Starting from near the visitor center and Bayview Trail, this trail cuts across the Main Marsh over a levee road. It connects with Lizard Rock Trail and D.U.S.T. Trail and Muskrat Trail before reaching a fenced-in Ohlone Indian shellmound archaeological site. The trail circles around the site before reaching the D.U.S.T. Marsh, Willows Trail and terminating at the paved Tuibun Trail.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  2.0 from 1 vote

#22926

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Rankings

#2,451

in California

#22,926

Overall
1 Views Last Month
44 Since Sep 4, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter