MTB Project Logo

A large, paved perimeter trail around the park.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.6

Miles

1.0

KM

Paved Path

1,044' 318 m

High

983' 300 m

Low

21' 6 m

Up

67' 20 m

Down

3%

Avg Grade (2°)

10%

Max Grade (6°)

Dogs Leashed

E-Bikes Unknown

Family Friendly ADA accessible. Low-grade paved path.

Description

The trail entrance begins at the Pickens Recreation Center parking lot. This large paved trail continues through a shady, wooded area where several views of the adjacent bike park are available.

The trail terminates at Pickens Jaycee Park after crossing a large steel bridge over Town Creek. The trail also provides access to the multi-use Town Creek Trail that follows Town Creek.

Contacts

Land Manager: City of Pickens

Shared By:

Glint Gossamer

Trail Ratings

  3.0 from 3 votes

#25468

Overall
  3.0 from 3 votes
5 Star
0%
4 Star
33%
3 Star
33%
2 Star
33%
1 Star
0%
Trail Rankings

#178

in South Carolina

#25,468

Overall
3 Views Last Month
405 Since Aug 28, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

Photos

Riding the wall.
Aug 28, 2016 near Pickens, SC
Town Creek Bike Park
Apr 18, 2019 near Pickens, SC
Cruising down the Rapid Transit boardwalk.
Aug 28, 2016 near Pickens, SC
Getting air on the dirt jumps.
Aug 28, 2016 near Pickens, SC
Rolling down the dirt jumps.
Aug 28, 2016 near Pickens, SC
Wall ride.
Aug 26, 2016 near Pickens, SC

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Aug 19, 2017
Connor Woodruff
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.