MTB Project Logo

blue Unfinished Business

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

1.0 mile 1.6 kilometer point to point
Singletrack
Intermediate

Elevation

Ascent: 164' 50 m
Descent: -35' -11 m
High: 547' 167 m
Low: 387' 118 m

Grade

Avg Grade: 4% (2°)
Max Grade: 11% (6°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Mike Anciaux

An awesome backside flow trail.

Mike Anciaux

E-Bikes Unknown

Features -none-

Description

This is another fabulous flow trail in Crockett Hills Regional Park. It can be ridden either way. The climbs are gradual and the sight lines are excellent. To ride down, access the entry from the Flowetry In Motion trail. You can also enter in the middle just past the farm building at the bottom of the Big Valley Trail.

From the top, the trail goes through the woods with lots of short ups, downs and turns so that you are always flowing. There is never a dull moment. The trail meets the Big Valley Trail just south of the farm building. It continues up a hill with banked switchback corners, lots of flowy turns and many bumps. It ends in the middle of the hill with markers that indicate future development. Turn around and retrace your steps.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Oct 6, 2018
SolonClimber Sly
Trail is overgrown and pretty beat. Needs some love for sure to be rideable 1mi
Sep 18, 2016
mark mcgowan
Mar 19, 2015
Mikael Palner

Trail Ratings

  4.7 from 3 votes

#1

in East Bay

#4038

Overall
  4.7 from 3 votes
5 Star
67%
4 Star
33%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#1

in East Bay

#225

in California

#4,038

Overall
7 Views Last Month
752 Since Mar 16, 2015
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter