MTB Project Logo

Yellow Trail

Easy/Intermediate

Trail

3.4 mile 5.5 kilometer point to point
Singletrack
Easy/Intermediate

Elevation

Ascent: 211' 64 m
Descent: -57' -17 m
High: 989' 301 m
Low: 819' 250 m

Grade

Avg Grade: 1% (1°)
Max Grade: 7% (4°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by ESG Greene

The eastern segment of a fast and flowy trail built in a modern and sustainable style.

ESG Greene

Electric Mountain Bikes Unknown

Features -none-

Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens. The clay rich soil sticks to your tires so well it's impossible to ride through anyway. Trails are also one way. There are many rumors of rangers handing out tickets for violations to both of these rules. Check here for the latest updates.

Description

The trail is generally well marked and consists of 95+% fast, flowy and generally flat singletrack through a young eastern forest. It can be started at the lower parking area. There are many stream crossings, most with bridges. There are also a couple of sections of boardwalk trail.

Continue straight onto the Red Trail when you intersect with this trail.

Go enjoy! It doesn't get much better than this in the Cleveland area.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Sep 7, 2019
Sandy Huizingh
Aug 23, 2018
Chris Phillips
3.4mi

Trail Ratings

  4.1 from 9 votes

#6477

Overall
  4.1 from 9 votes
5 Star
33%
4 Star
44%
3 Star
22%
2 Star
0%
1 Star
0%
Trail Rankings

#106

in Ohio

#6,477

Overall
18 Views Last Month
1,267 Since May 9, 2013
Easy/Intermediate

29%
0%
71%
0%
0%
0%

Photos

Remnants of an old cabin in the woods along the trail
Aug 27, 2014 near Strongs…, OH
A fun hairpin turn.
May 11, 2013 near Strongs…, OH
A black rat snake? Found crossing the trail.
May 9, 2013 near Strongs…, OH
Taking a quick ride on our localest trail. Hopefully with the great success of this trail the Cleveland Metroparks will be building (and allowing us to build) many more trails of this same high quality.
May 9, 2013 near Strongs…, OH
The trail closure signs at the trailheads.
May 11, 2013 near Strongs…, OH
The trail is built with many bridges and suspended trails such as this to try to up its sustainability.
May 9, 2013 near Strongs…, OH

0 Comments

MTB Project is supported by

Support Your Local IMBA Chapter