Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Rooney Valley Trail

 22 votes

2.5 Miles 4.0 Kilometers


Singletrack

97' 30 m

Ascent

-769' -234 m

Descent

6,821' 2,079 m

High

6,150' 1,875 m

Low

7%

Avg Grade (4°)

19%

Max Grade (11°)

All Clear

6 days agoUpdate

A slightly more difficult trail cutting through the middle of the park.

Mike Ahnemann

Overview

Description

This trail is probably still rideable by most riders, but it's a bit more challenging than the Green Mountain Loop. It's singletrack, which makes it a nice trail to add to a loop in this area, rather than riding the doubletrack section of Green Mountain Loop along the ridge.

Starting at the top along the ridge, this trail heads mostly downhill for close to a mile. It's somewhat steep in places, with some smaller loose rocks, so beginners will want to take it slow. More advanced riders will find it adds some fun to a ride in this area.

You'll reach a junction about a third of the way down. Stay right to get on the Rooney connector that takes you back towards the Rooney Road trailhead, or stay left to continue on the main Rooney Valley Trail.

The option to the left adds a couple of short steep climbs and descents, followed by a final descent on 2-track back down to the Green Mountain Loop, at the southern edge.

Contacts

Rate Trail


   Clear Rating

3.3 from 22 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Jun 18, 2017
Franklin Gauer
Rode on father's day - 2017
Jun 15, 2017
laura Kimble
Rode RV up to reach the summit
Jun 12, 2017
Alec Caprarella
May 29, 2017
Joe Haberer
May 21, 2017
Andrew Tamburelli
May 15, 2017
Michael Rock
May 13, 2017
Rich Purdy
Apr 12, 2017
kevin wright
Fun ride

Stewarded By


Trail Ratings

  3.3 from 22 votes

#4543

Overall
  3.3 from 22 votes
5 Star
9%
4 Star
27%
3 Star
50%
2 Star
14%
1 Star
0%
Rankings

#433

in Colorado

#4,543

Overall
168 Views Last Month
2,934 Since Nov 14, 2013
Intermediate Intermediate

0%
23%
77%
0%
0%
0%

Conditions


All Clear 6 days ago

Getting forecast...

JCrosby  
Head ups. Looks like trail maintenance was done recently so expect new drainage ditches, etc. Some of the areas that were expanding to double track have been filled in with large boulders. Jun 16, 2017

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter