MTB Project Logo

“The longest and most varied of the new trails, Satellite has something for all abilities. ”


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List

1.5

Miles

2.4

KM

Singletrack

1,049' 320 m

High

974' 297 m

Low

112' 34 m

Up

118' 36 m

Down

3%

Avg Grade (2°)

10%

Max Grade (6°)

Dogs Leashed

E-Bikes Allowed

Features Flow

One Way Only: This is designated as a directional trail.

Need to Know

Be cautious - this is a shared trail with other users who should be moving counter-flow but frequently are not.

Description

Opened in 2025 and tweaked in 2026, Satellite Loop is the longest and most significant of the new trails. Featuring a little bit of everything - some pedal flow on top of the hill, a link into the skills course, a long downhill section featuring plenty of b-lines and a pump section, and then a decently flowy climb back up to the start.

Note there are several access points to this trail - via the start marked here, the Skills Area, a parking lot at the beginning of the climb, and a connector trail from Tower Loop.

Contacts

Shared By:

Matt H

Trail Ratings

  5.0 from 1 vote

#6044

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#139

in Ohio

#6,044

Overall
0 Views Last Month
0 Since Aug 13, 2026
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

All Clear 15 days ago
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.