MTB Project Logo

A fast, flowing entrance into the 3 Stage trail system.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.5

Miles

0.8

KM

Singletrack

1,734' 529 m

High

1,710' 521 m

Low

20' 6 m

Up

27' 8 m

Down

2%

Avg Grade (1°)

4%

Max Grade (2°)

Dogs Unknown

E-Bikes Unknown

Description

From the Sideroad 6 and 2nd Line parking lot you can enter (or exit) the 3 Stage trail system on this fast and flowing trail.

A more direct and less technical entrance than Green-1, Osler Side Trail is a great, fast singletrack to get the blood pumping and the feel of the bike under you. The trail meets up with Green-1 and eventually ends at The Gateway doubletrack. From The Gateway, you'll have many options to make this an epic ride.

Shared By:

Trevor Miller

Trail Ratings

  3.0 from 1 vote

#15

in 3 Stage

#30445

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#15

in 3 Stage

#302

in Ontario

#30,445

Overall
2 Views Last Month
40 Since Jun 13, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

A rooty descent on Osler Side Trail.
Jun 13, 2016 near Colling…, ON

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started.