Yellow Trail

 2 votes

3.4 Miles 5.5 Kilometers

Singletrack

211' 64 m

Ascent

-57' -17 m

Descent

989' 301 m

High

819' 250 m

Low

1%

Avg Grade (1°)

7%

Max Grade (4°)

All Clear

989' 301 m

High

819' 250 m

Low

1%

Avg Grade (1°)

7%

Max Grade (4°)

The eastern segment of a fast and flowy trail built in a modern and sustainable style.

Building Map
Loading Map Data
Map Settings
Featured Ride
Trail

Description

Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens. The clay rich soil sticks to your tires so well it's impossible to ride through anyway. Trails are also one way. There are many rumors of rangers handing out tickets for violations to both of these rules. Check here for the latest updates.
The trail is generally well marked and consists of 95+% fast, flowy and generally flat singletrack through a young eastern forest. It can be started at the lower parking area. There are many stream crossings, most with bridges. There are also a couple of sections of boardwalk trail.

Continue straight onto the Red Trail when you intersect with this trail.

Go enjoy! It doesn't get much better than this in the Cleveland area.

Contacts

Rate Trail


   Clear

4.0 from 2 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  4.0 from 2 votes

#3996

Overall
  4.0 from 2 votes
1 Star
0%
2 Star
0%
3 Star
0%
4 Star
100%
5 Star
0%
Rankings

#60

in Ohio

#3,996

Overall
17 Views Last Month
651 Since May 9, 2013
Easy Easy

100%
0%
0%
0%
0%
0%

Conditions


All Clear on Aug 6, 2016

Forecasting the weather...

Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter