Cozyline Trail

 7 votes

3.2 Miles 5.2 Kilometers

Singletrack

966' 294 m

Ascent

-79' -24 m

Descent

8,441' 2,573 m

High

7,551' 2,302 m

Low

6%

Avg Grade (3°)

15%

Max Grade (9°)

All Clear

8,441' 2,573 m

High

7,551' 2,302 m

Low

6%

Avg Grade (3°)

15%

Max Grade (9°)

New trail with great flowing sections that can be enjoyed both up and down.

Building Map
Loading Map Data
Map Settings
Featured Ride
Trail

Description

Seasonal Wildlife Closure from Dec. 1 through May 15.
This is a new trail constructed in Summer and Fall of 2013. It provides access to Sky Mountain Park from the Intercept Lot area and Brush Creek Bike Path. The trail connects with Skyline Ridge trail at its upper end, and intersects with the new Airline Trail about 2/3 of the way up.

The trail was built by a combination of volunteers, youth corps, and trail building machines. As such, the character changes a couple times along it's length. Long gently graded climbs on the up equal fast brake-free flowing sections on the descent. This one is a must-ride for both locals and visitors!

Contacts

Rate Trail


   Clear

4.1 from 7 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Sep 19, 2015
Jesse Sakires
Aug 24, 2014
Erin Delk
Jun 6, 2014
Nick Wilder
May 29, 2014
Erin Delk
first time riding it. still a bit of loose patches that hopefully more riders riding will pack down

Stewarded By


Trail Ratings

  4.1 from 7 votes

#8

in Aspen

#2366

Overall
  4.1 from 7 votes
1 Star
0%
2 Star
0%
3 Star
0%
4 Star
86%
5 Star
14%
Rankings

#8

in Aspen

#215

in Colorado

#2,366

Overall
38 Views Last Month
1,287 Since May 23, 2014
Intermediate Intermediate

0%
40%
40%
20%
0%
0%

Conditions


All Clear on Sep 6, 2016
Some Mud Mostly Dry
Update ConditionsHistory

Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter