MTB Project Logo

The more technical trail at High Bridge State Park.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.6

Miles

4.2

KM

Singletrack

436' 133 m

High

377' 115 m

Low

158' 48 m

Up

175' 53 m

Down

2%

Avg Grade (1°)

7%

Max Grade (4°)

Dogs Unknown

E-Bikes Unknown

Description

This more technical trail is all singletrack - It's intermediate skill level - rolling with several steep climbs along the way.

Contacts

Land Manager: Virginia State Parks

Shared By:

Brian Vandegrift

Trail Ratings

  4.1 from 8 votes

#1

in Farmville

#9782

Overall
  4.1 from 8 votes
5 Star
38%
4 Star
38%
3 Star
25%
2 Star
0%
1 Star
0%
Trail Rankings

#1

in Farmville

#246

in Virginia

#9,782

Overall
1 Views Last Month
1,344 Since Nov 15, 2014
Intermediate/Difficult Intermediate/Difficult

0%
0%
38%
13%
50%
0%

Photos

My 7 year old daughter is having a blast on the Earley Trail.  A great trail for beginners, but still challenges everyone with a little climb at the start.
Oct 31, 2015 near Farmville, VA
There she goes!  Notice the blue rectangle trail marker on the tree just behind and above my daughter.  Follow these markers to stay on the Earley Trail.
Oct 31, 2015 near Farmville, VA
Heading west toward high bridge
Apr 26, 2022 near Farmville, VA
Map of the four mountain bike trails at Rochelle area
Sep 26, 2019 near Farmville, VA
Looking at the entrance and exit of Burnside Trail. Enter and turn to the left as the trail runs clockwise. Look for the red reflectors on trees as trail markers along the way. The entrance to Early Trail is on up the logging road at the top of the hill.
Oct 21, 2015 near Farmville, VA
loading

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Sep 1, 2019
Flash Man
Apr 10, 2019
Rob Fortner
Love this trail. Lots of fun! — 10h 33m
Mar 21, 2016
Bryan Burnside
Oct 22, 2015
Brian Scythes
Trail all to myself. Great weather for a ride.
Oct 20, 2015
Brian Scythes
Rode from the parking area at Main St in Farmville for Rails to Trails to Burnside Trail and back. 5.7mi — 44h 30m
Sep 17, 2015
Brian Scythes
Second time on the trail. Had it to myself. Lots of spiderwebs. Had fun.
Sep 15, 2015
Brian Scythes
First time on the trail. Had it to myself. Lots of spiderwebs.
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started