MTB Project Logo

This is just a small leg of a larger trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.1

Miles

3.4

KM

Paved Path

629' 192 m

High

605' 184 m

Low

35' 11 m

Up

44' 13 m

Down

1%

Avg Grade (0°)

3%

Max Grade (2°)

Dogs Leashed

E-Bikes Not Allowed

Small gravel patch before the paved path begins.

Description

This path is actually a small leg of a larger system. The trail continues to the south into Days Dam Metro Park or, if you head west at the trailhead, it continues on a ways ending at 611 near Kansas Road in Lorain.

This section of trail isn't very pleasant. There is almost no shade till you're near Days Dam Metro Park. Before the second bridge, the trail is tightly fenced off with a very 'mad max' vibe. To the west is the dormant Lorain Steel Mill and to the east, a gravel pit. After a mile of this view, you'll come to a bridge that crosses the river then it does open up to a wooded area.

Contacts

Shared By:

Johnny Richmond

Trail Ratings

  2.0 from 1 vote

#36512

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Trail Rankings

#468

in Ohio

#36,512

Overall
1 Views Last Month
97 Since Sep 21, 2019
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Aug 12, 2020
Jon Secue
First (or last) section of these 3 connecting trails. All paved with exception of the lead in from the parking lot. Few bridges over the Black River.
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started