MTB Project Logo

Landon Nature Trail

 4.0 (1)

12.5 Miles 20.1 Kilometers


Doubletrack

172' 52 m

Ascent

-157' -48 m

Descent

0%

Avg Grade (0°)

1%

Max Grade (1°)

1,059' 323 m

High

896' 273 m

Low

Shared By Aimenel Entreri

Conditions


Unknown

Getting forecast...

Needs Summary

Aimenel Entreri

Dogs Leashed

Features -none-

Need to Know

The trail goes through some less than reputable neighborhoods. Riding only during the day is recommended.

Description

The trail begins at the historic Brown vs. Board of Education building near downtown Topeka. From there it proceeds south on a paved path down to 45th Street. From there the trail continues unpaved past Forbes Field to the Berryton Post Office. Be on the lookout for horseback riders on the trail past 45th Street. The trail was originally intended to link up with the Flint Hills Nature Trail, but a significant portion of the route south of Berryton has allegedly reverted to private property.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#1

in Topeka

#9088

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#1

in Topeka

#67

in Kansas

#9,088

Overall
7 Views Last Month
27 Since Apr 27, 2018
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter