MTB Project Logo

Stoddard Pathway

Easy/Intermediate

Trail

2.9 mile 4.7 kilometer point to point
Paved Path
Easy/Intermediate

Elevation

Ascent: 7' 2 m
Descent: -50' -15 m
High: 2,545' 776 m
Low: 2,502' 763 m

Grade

Avg Grade: 0% (0°)
Max Grade: 1% (1°)

Dogs

Leashed
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Joseph States

A quiet, secluded Rail-to-Trail in South Nampa.

Joseph States

Electric Mountain Bikes Unknown

Features -none-

Family Friendly Wide and flat, easy to ride.

This trail is maintained by the Nampa Parks and Rec. It is closed from sunset to sunrise.

Description

Stoddard Pathway is a rail-to-trail project that is still underfunded and in the works. The trail and the right of way are established but the north end of the trail is as of 2018, still unpaved.

From the south end: The trail starts at the Ridenbaugh Canal and runs north with connections to various subdivisions, Maple Wood Park, and the Partridge Pathway Trail.

This trail crosses the following roads: Locust Ln, Greenhurst Rd, Iowa Ave, Amity Ave, and Sherman Ave where it ends as of 2018.

Biked this trail?

We need help with the following missing trail information:

Photos, ADA Accessible, Need to Know, Features, Electic Mountain Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Jun 30, 2018
Ridge Hainsworth
May 12, 2018
Ray Moss
7.6mi

Trail Ratings

  4.0 from 2 votes

#8716

Overall
  4.0 from 2 votes
5 Star
50%
4 Star
0%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#356

in Idaho

#8,716

Overall
5 Views Last Month
211 Since Feb 26, 2018
Easy/Intermediate

50%
50%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter