MTB Project Logo

A Trail

Intermediate
 3.0 (1)

A fun, rolling trail.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

0.3

Miles

0.5

KM

Singletrack

583' 178 m

High

556' 169 m

Low

37' 11 m

Up

44' 13 m

Down

5%

Avg Grade (3°)

9%

Max Grade (5°)

Dogs Unknown

E-Bikes Unknown

Features -none-

Description

From the Pipeline Trail, the A Trail is one of the lower trails in the Rockcliffe section, just above the power line section. This is a fun little section off the B Trail that is more rolling than many of the other trails, which are typically longer, tougher climbs and descents.

Shared By:

Trevor Miller

Trail Ratings

  3.0 from 1 vote

#30

in Waterdown

#26316

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#30

in Waterdown

#367

in Ontario

#26,316

Overall
1 Views Last Month
10 Since Sep 7, 2017
Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Current Trail Conditions

Update Conditions
Unknown See History
Add Your Check-In

Check-Ins

none