MTB Project Logo

A Trail

Intermediate

Trail

0.3 mile 0.5 kilometer point to point
Singletrack
Intermediate

Elevation

Ascent: 37' 11 m
Descent: -44' -13 m
High: 583' 178 m
Low: 556' 169 m

Grade

Avg Grade: 5% (3°)
Max Grade: 9% (5°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Trevor Miller

A fun, rolling trail.

Trevor Miller

Electric Mountain Bikes Unknown

Features -none-

Description

From the Pipeline Trail, the A Trail is one of the lower trails in the Rockcliffe section, just above the power line section. This is a fun little section off the B Trail that is more rolling than many of the other trails, which are typically longer, tougher climbs and descents.

Biked this trail?

We need help with the following missing trail information:

Photos, Family Friendly, ADA Accessible, Need to Know, Dogs Allowed, Features, Electic Mountain Bikes Allowed

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#29

in Waterdown

#24071

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#29

in Waterdown

#328

in Ontario

#24,071

Overall
2 Views Last Month
7 Since Sep 7, 2017
Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter