MTB Project Logo

Pipeline Trail

 3.0 (1)
Trail Mapped Wrong?

Length

0.4 Miles 0.6 Kilometers


Singletrack

Elevation

0' 0 m

Ascent

-87' -26 m

Descent

5%

Avg Grade (3°)

10%

Max Grade (6°)

635' 194 m

High

548' 167 m

Low

Conditions


Unknown

Getting forecast...

An airy ride down the ravine.

Trevor Miller

Overview

Features: -none- [Add/Remove]

Description [Suggest Changes]

The Pipeline Trail commences at the Bruce Side Trail - Iroquoia Section and ends at the intersection of the Z Trail and N Trail, or where the power lines run. A fairly open, wide singletrack trail, which can be used in either direction without too much difficulty.

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#26

in Waterdown

#18877

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#26

in Waterdown

#249

in Ontario

#18,877

Overall
1 Views Last Month
8 Since Jul 17, 2017
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter