MTB Project Logo

Bicentennial Greenway: High Point Section

 4.0 (3)
Trail Mapped Wrong?

Length

9.1 Miles 14.6 Kilometers


Paved Path

Elevation

425' 130 m

Ascent

-533' -163 m

Descent

2%

Avg Grade (1°)

15%

Max Grade (8°)

911' 278 m

High

762' 232 m

Low

Conditions


Unknown

Getting forecast...

Mixed surface greenway from Southern Greensboro through Northern High Point; much of it runs next to the Deep River.

Adam Oldham

Overview

Features: -none- [Add/Remove]
Family Friendly: Runs next to river and lake and ends near a nature preserve.
Dogs: Leashed

Description [Suggest Changes]

This is the High Point portion of the Bicentennial Greenway. This should be completed to near downtown High Point in 2018. There is also a Greensboro portion that will be connected one day.

This trail is mostly flat following the Deep River. A portion of it has some smaller rolling hills and one difficult climb. Much of the the trail parallels the Piedmont Environmental Center and High Point City Lake. It also passes Gibson Park.

Though most of the trail is paved, there are portions where the pavement is rough and damaged from roots or very overgrown making it more like singletrack.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Sep 23, 2017
Mike Y

Trail Ratings

  4.0 from 3 votes

#1

in Greensboro

#6167

Overall
  4.0 from 3 votes
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#1

in Greensboro

#203

in North Carolina

#6,167

Overall
10 Views Last Month
96 Since Aug 6, 2017
Easy/Intermediate Easy/Intermediate

33%
67%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter