MTB Project Logo

greenBlue Bicentennial Greenway: High Point Section

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

9.1 mile 14.6 kilometer point to point
Paved Path
Easy/Intermediate

Elevation

Ascent: 425' 130 m
Descent: -533' -163 m
High: 911' 278 m
Low: 762' 232 m

Grade

Avg Grade: 2% (1°)
Max Grade: 15% (8°)

Dogs

Leashed
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Adam Oldham

Mixed surface greenway from Southern Greensboro through Northern High Point; much of it runs next to the Deep River.

Adam Oldham

E-Bikes Unknown

Features -none-

Family Friendly Runs next to river and lake and ends near a nature preserve.

Description

This is the High Point portion of the Bicentennial Greenway. This should be completed to near downtown High Point in 2018. There is also a Greensboro portion that will be connected one day.

This trail is mostly flat following the Deep River. A portion of it has some smaller rolling hills and one difficult climb. Much of the the trail parallels the Piedmont Environmental Center and High Point City Lake. It also passes Gibson Park.

Though most of the trail is paved, there are portions where the pavement is rough and damaged from roots or very overgrown making it more like singletrack.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Sep 23, 2017
Mike Y

Trail Ratings

  4.0 from 3 votes

#1

in Greensboro

#7357

Overall
  4.0 from 3 votes
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#1

in Greensboro

#274

in North Carolina

#7,357

Overall
24 Views Last Month
290 Since Aug 6, 2017
Easy/Intermediate Easy/Intermediate

33%
67%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter