MTB Project Logo

Lakeside Trail

 4.0 (3)
Zoom in to see details
Map Key

2.1 Miles 3.5 Kilometers


Doubletrack

215' 65 m

Ascent

-156' -48 m

Descent

3%

Avg Grade (2°)

11%

Max Grade (6°)

1,664' 507 m

High

1,542' 470 m

Low

Shared By Anthony D.

Conditions


All Clear 61 days ago
Dry, Mostly Dry - Lots of leafs on the ground covering minor obstacles History

Getting forecast...

A gravel multi-use path following the shoreline of the lake.

Anthony D.

Dogs Unknown

Features -none-

Description

This trail is a gravel pathway that connects the two sides of Steele Creek Park. The southern end begins at Rooster Front Park and the northern end begins at the Mill Creek parking area off of Broad Street. The Mill Creek parking can be accessed via the Beaver Creek Greenway that connects the lot with downtown Bristol.

If you're in town, riding the greenway to and from the trails is a great way to start and end your ride. There are lots of great restaurants and breweries downtown and is worth the greenway ride.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Aug 12, 2018
Johnny Dabbs
2mi
Apr 9, 2018
Jason Humphrey
Feb 24, 2018
Brandon Lemon

Stewarded By


Trail Ratings

  4.0 from 3 votes

#7184

Overall
  4.0 from 3 votes
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#135

in Tennessee

#7,184

Overall
1 Views Last Month
98 Since Nov 4, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter