MTB Project Logo

Lakeside Trail

 2 votes

Length

2.1 Miles 3.5 Kilometers


Doubletrack

Elevation

215' 65 m

Ascent

-156' -48 m

Descent

3%

Avg Grade (2°)

11%

Max Grade (6°)

1,664' 507 m

High

1,542' 470 m

Low

Conditions


Unknown

Getting forecast...

A gravel multi-use path following the shoreline of the lake.

Anthony D.

Overview

Description

This trail is a gravel pathway that connects the two sides of Steele Creek Park. The southern end begins at Rooster Front Park and the northern end begins at the Mill Creek parking area off of Broad Street. The Mill Creek parking can be accessed via the Beaver Creek Greenway that connects the lot with downtown Bristol.

If you're in town, riding the greenway to and from the trails is a great way to start and end your ride. There are lots of great restaurants and breweries downtown and is worth the greenway ride.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Apr 9, 2018
Jason Humphrey
Feb 24, 2018
Brandon Lemon

Stewarded By


Trail Ratings

  4.0 from 2 votes

#6611

Overall
  4.0 from 2 votes
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#118

in Tennessee

#6,611

Overall
1 Views Last Month
72 Since Nov 4, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter