Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Rock Cut Trail

 1 vote

1.0 Miles 1.5 Kilometers


Singletrack

506' 154 m

Ascent

0' 0 m

Descent

2,125' 648 m

High

1,619' 494 m

Low

10%

Avg Grade (6°)

20%

Max Grade (11°)

Unknown

Update

A mellow, but tough climb with a very steep fall-line finish.

Anthony D.

Overview

Description

This trail can be accessed from the Broad Street parking area at the terminus of the Beaver Creek Greenway. If you're in downtown Bristol, you can ride the greenway just a couple of miles to this trail and get a ride in.

The trail itself is mostly mellow for the first half. It will make a noticeable sharp left-hand turn and get tougher. The trail turns into a fall-line climb that is slightly eroded, but the singletrack at the top is worth the climb.

Contacts

Rate Trail


   Clear Rating

4.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Sep 9, 2017
Travis Lilly
Jun 12, 2017
Jacob Blevins
Really fun spot the climb is a little rough but when u get going it's fine. It's worth it when u come down gets a little rough in spots. 1mi — 1h 00m

Stewarded By


Trail Ratings

  4.0 from 1 vote

#8162

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#131

in Tennessee

#8,162

Overall
3 Views Last Month
31 Since Nov 1, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter