Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Lakeside Park and Centennial Lake Paths

 3.0 (1)

5.6 Miles 9.0 Kilometers


0%

Singletrack

42' 13 m

Ascent

-42' -13 m

Descent

0%

Avg Grade (0°)

1%

Max Grade (1°)

1,496' 456 m

High

1,474' 449 m

Low

Shared By Andy Cramb

Conditions


Unknown

Getting forecast...

This is a connection of three different areas to make one fun ride.

Andy Cramb

Dogs Leashed

Features -none-

Family Friendly All of this would be great for taking the kids along, use caution at the train tracks and HWY 81 crossing.

Overview

A connection of two parks and a linear path along the railroad to make a five mile round trip.

Description

If you start out at the north end, there are several parking opportunities. From there, cruise around Lakeside Park Lake and then south to the Wall Centennial Park Lake. Then, off to the east is a linear path along the active train tracks. Use caution crossing the tracks, the trains move through here at 40mph or so.

Contacts

Land Manager: McPherson, KS

You & This Featured Ride


Rate Quality


   Clear Rating

Rate Difficulty

Share This Ride

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#3272

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#17

in Kansas

#3,272

Overall
3 Views Last Month
99 Since Oct 2, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter