MTB Project Logo

Red Bud Trail - Andover

 3 votes

Length

6.4 Miles 10.3 Kilometers


Paved Path

Elevation

44' 13 m

Ascent

-69' -21 m

Descent

0%

Avg Grade (0°)

1%

Max Grade (0°)

1,362' 415 m

High

1,330' 406 m

Low

Conditions


Unknown

Getting forecast...

A great multi-use path on the former BNSF rail line!

Andy Cramb

Overview

Features: -none-
Family Friendly: This paved and then fine chat surface is a great way to get your family away from traffic!
Dogs: Leashed

Need to Know

The chat is fresh as of May 2018 and rain has washed out some places along the side of the trail. Use caution if riding at night if you're not used to paying attention. Watch for vehicles at every major road crossing, people aren't used to cyclists in the area yet.

Description

The City of Andover has paved a 1.75-mile section of the Red Bud Trail that is six miles away from the paved section of Red Bud Trail in Wichita, KS. The trail between these two paths is not officially open, but some ride it anyway. This would make the section from downtown Wichita to Andover about 12 miles long. The latest addition to the trail extends from 13th Street east to US54 highway. Sadly, the bridge over Highway 54 was removed a few years back and local efforts couldn't stop it.

Contacts

Land Manager: City of Andover

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  3.3 from 3 votes

#15

in Wichita

#12668

Overall
  3.3 from 3 votes
5 Star
0%
4 Star
67%
3 Star
0%
2 Star
33%
1 Star
0%
Rankings

#15

in Wichita

#104

in Kansas

#12,668

Overall
44 Views Last Month
865 Since Jul 20, 2015
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter