MTB Project Logo

A reclaimed rail corridor, this path connects downtown Wichita to the 13th and Broadway area.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.4

Miles

2.3

KM

Paved Path

1,306' 398 m

High

1,300' 396 m

Low

3' 1 m

Up

9' 3 m

Down

0%

Avg Grade (0°)

0%

Max Grade (0°)

Dogs Leashed

E-Bikes Unknown

Description

A newer concrete surface trail that connects downtown to a mile or so North on Broadway.

Contacts

Shared By:

Andy Cramb

Trail Ratings

  4.0 from 1 vote

#6

in Wichita

#16742

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#6

in Wichita

#144

in Kansas

#16,742

Overall
2 Views Last Month
88 Since May 21, 2015
Easy Easy

100%
0%
0%
0%
0%
0%

Photos

Riding the Midtown Path
May 21, 2015 near Wichita, KS
End of the line...or the beginning.  You pick!
May 21, 2015 near Wichita, KS
Riding the Midtown path
May 21, 2015 near Wichita, KS
What time is it?
May 21, 2015 near Wichita, KS

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started