MTB Project Logo

The Urban Trail

Intermediate
 4.0 (24)

Singletrack connection between Phase I and II at Slaughter Pen.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

1.2

Miles

2.0

KM

Singletrack

1,148' 350 m

High

1,077' 328 m

Low

78' 24 m

Up

121' 37 m

Down

3%

Avg Grade (2°)

11%

Max Grade (7°)

Dogs Unknown

E-Bikes Allowed

Features -none-

Description

The Urban Trail provides a singletrack connection between Phase I and II in the Slaughter Pen trail network. It parallels the paved bikeway but provides the woods experience. The route is mostly flat with a few rollers to navigate.

On the southern end, The Urban Trail connects with Razorback Ridge. On the northern end the route follows the bottom of a steep hillside and pops out within view of Phase I.

About midway through the route, you'll cross over a doubletrack going steeply up the hill. This is known as 'The President Bush Push'. Be sure to stop and read the sign to get the story. Maybe you're up for the challenge?

Contacts

Shared By:

Leslie Kehmeier

Trail Ratings

  4.0 from 24 votes

#1111

Overall
  4.0 from 24 votes
5 Star
21%
4 Star
54%
3 Star
25%
2 Star
0%
1 Star
0%
Trail Rankings

#54

in Arkansas

#1,111

Overall
25 Views Last Month
1,365 Since May 22, 2014
Intermediate

14%
5%
76%
0%
5%
0%

Photos

Sending it off the rock drop!
Nov 17, 2018 near Bentonv…, AR
The Bush Push start as seen from Urban Trail.
Jan 3, 2018 near Bentonv…, AR

0 Comments

Weather


Current Trail Conditions

Update Conditions
All Clear 18 days ago See History
Add Your Check-In

Check-Ins

Jul 14, 2019
Judith Brown
Rides with Ben, Allison, & Chase! Great except for recovering from food poisoning!
Jun 14, 2019
Aaron Madey
Jun 1, 2019
Kenneth Allen
1.2mi
Nov 10, 2018
Jason Dunderdale
Oct 27, 2018
Jordan Tasker
Aug 18, 2018
Jordan Tasker
1.2mi
Jul 17, 2018
Gene Kemp
Jul 9, 2018
Aaron Gardner