MTB Project Logo

The Urban Trail

 13 votes

Length

1.2 Miles 2.0 Kilometers


Singletrack

Elevation

78' 24 m

Ascent

-121' -37 m

Descent

3%

Avg Grade (2°)

11%

Max Grade (7°)

1,148' 350 m

High

1,077' 328 m

Low

Conditions


Minor Issues 26 days ago
Muddy History

Getting forecast...

Singletrack connection between Phase I and II at Slaughter Pen.

Leslie Kehmeier

Overview

Description

The Urban Trail provides a singletrack connection between Phase I and II in the Slaughter Pen trail network. It parallels the paved bikeway but provides the woods experience. The route is mostly flat with a few rollers to navigate.

On the southern end, The Urban Trail connects with Razorback Ridge. On the northern end the route follows the bottom of a steep hillside and pops out within view of Phase I.

About midway through the route, you'll cross over a doubletrack going steeply up the hill. This is known as 'The President Bush Push'. Be sure to stop and read the sign to get the story. Maybe you're up for the challenge?

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Nov 25, 2017
Troy Mack
Sep 28, 2017
Corey B
1mi
Sep 3, 2017
Lisa Zimmerman
Jul 7, 2017
Austin Lambert
Jun 21, 2017
Trent Madsen
Jun 20, 2017
Trent Madsen
Jun 16, 2017
Dallas Rysavy
Jun 15, 2017
Dallas Rysavy
it was hot

Stewarded By


Trail Ratings

  3.9 from 13 votes

#4430

Overall
  3.9 from 13 votes
5 Star
23%
4 Star
46%
3 Star
31%
2 Star
0%
1 Star
0%
Rankings

#75

in Arkansas

#4,430

Overall
19 Views Last Month
640 Since May 22, 2014
Easy/Intermediate Easy/Intermediate

18%
36%
36%
9%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter