MTB Project Logo

greenBlue The Urban Trail

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

1.2 mile 2.0 kilometer point to point
Singletrack
Easy/Intermediate

Elevation

Ascent: 78' 24 m
Descent: -121' -37 m
High: 1,148' 350 m
Low: 1,077' 328 m

Grade

Avg Grade: 3% (2°)
Max Grade: 11% (7°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Leslie Kehmeier

Singletrack connection between Phase I and II at Slaughter Pen.

Leslie Kehmeier

E-Bikes Allowed

Features -none-

Description

The Urban Trail provides a singletrack connection between Phase I and II in the Slaughter Pen trail network. It parallels the paved bikeway but provides the woods experience. The route is mostly flat with a few rollers to navigate.

On the southern end, The Urban Trail connects with Razorback Ridge. On the northern end the route follows the bottom of a steep hillside and pops out within view of Phase I.

About midway through the route, you'll cross over a doubletrack going steeply up the hill. This is known as 'The President Bush Push'. Be sure to stop and read the sign to get the story. Maybe you're up for the challenge?

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Nov 10, 2018
Jason Dunderdale
Oct 27, 2018
Jordan Tasker
Aug 18, 2018
Jordan Tasker
1.2mi
Jul 17, 2018
Gene Kemp
Jul 9, 2018
Aaron Gardner
Jun 26, 2018
Dustin Leavitt
Mar 17, 2018
Lynne Jensen
Mar 17, 2018
Patrick Jensen

Stewarded By


Trail Ratings

  4.0 from 21 votes

#3668

Overall
  4.0 from 21 votes
5 Star
24%
4 Star
48%
3 Star
29%
2 Star
0%
1 Star
0%
Rankings

#91

in Arkansas

#3,668

Overall
30 Views Last Month
1,051 Since May 22, 2014
Easy/Intermediate Easy/Intermediate

16%
37%
42%
5%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter