MTB Project Logo

Telephone Loop (East)

 2.0 (2)

3.8 Miles 6.1 Kilometers


Doubletrack

515' 157 m

Ascent

-403' -123 m

Descent

5%

Avg Grade (3°)

22%

Max Grade (13°)

4,961' 1,512 m

High

4,619' 1,408 m

Low

Shared By Paul Lindfield

Conditions


Unknown

Getting forecast...

An older multi-use/ski trail that was upgraded to help it dry out.

Paul Lindfield

Dogs Off-leash

Features -none-

Description

This is the eastern side of the old Telephone Loop, which is designated as an all-season trail, as well as a cross-country ski trail in winter. With Telephone Loop (West) it forms an approx 17km loop from the trailhead. It's mostly doubletrack although it does narrow at some points. It's an easy trail with nothing very technical and no major climbs; just lots of short ups and downs.

The Eastern side of the loop was upgraded in 2014 and again in 2015 to fix drainage problems and to improve the ability of the trail to dry faster. There is now a ride-over cattle guard at the grazing allotment boundary, so there is no more stopping to open/close gates.

The entire Telephone Loop is designated as a winter multi-user trail. The Eastern side is groomed by GBCTA volunteers with a single XC ski track on one side of the tread and packed smooth for fat bikes on the other half of the tread.

The northern half of the trail is useful for reconnecting Disconnect to the end of Long Distance (2.6km). The southern half of the trail provides an easier alternative route between the trailhead and Long Distance or Disconnect. You'll pass through intersections with the Snowshoe Hare and Hostel snowshoeing and ski loops.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  2.0 from 2 votes

#23971

Overall
  2.0 from 2 votes
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Rankings

#74

in Alberta

#23,971

Overall
1 Views Last Month
100 Since May 10, 2014
Easy/Intermediate Easy/Intermediate

50%
50%
0%
0%
0%
0%

 
East Telephone was upgraded in 2014 and again in 2015 to fix drainage problems and to improve the ability of the trail to dry faster. There is now a ride-over cattle guard at the grazing allotment boundary, so there is no stopping to open/close gates. Starting in November 2016, the entire Telephone Loop is designated as a winter multi-user trail. It will be groomed with a single XC ski track on one side of the tread and packed smooth for fat bikes on the other half of the tread. Jul 6, 2016

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter