MTB Project Logo

Applesauce Prequel Trail

 2 votes

Length

0.6 Miles 1.0 Kilometers


Singletrack

Elevation

3' 1 m

Ascent

-38' -12 m

Descent

1%

Avg Grade (1°)

5%

Max Grade (3°)

1,256' 383 m

High

1,218' 371 m

Low

Conditions


Unknown

Getting forecast...

Super nice flowing trail. One of those that feels downhill both ways.

jeff parker

Overview

Features: -none-

Description

Applesauce Prequel starts with a short turn through a hilltop field and capped rock pile before beginning one of the best descents around. Gliding down the hillside, the grade and reversals are perfect, making for effortless flow. After the intersection with Two Hoots Too Trail, it's more of the same perfection right down the the parking lot. No wonder some folks have taken to calling this trail Happy Endings.

Contacts

Local Club: Swedetown Trails Club

Land Manager: Calumet Township

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 2 votes

#7152

Overall
  4.0 from 2 votes
5 Star
50%
4 Star
0%
3 Star
50%
2 Star
0%
1 Star
0%
Rankings

#122

in Michigan

#7,152

Overall
1 Views Last Month
54 Since Oct 18, 2013
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter