MTB Project Logo

Cable Connector Trail

 1 vote

Length

0.4 Miles 0.7 Kilometers


Singletrack

Elevation

21' 6 m

Ascent

-1' -0 m

Descent

1%

Avg Grade (1°)

3%

Max Grade (2°)

1,198' 365 m

High

1,178' 359 m

Low

Conditions


Unknown

Getting forecast...

Cable connector is a twisty, lumpy, basically rock free trail through mixed forest.

jeff parker

Overview

Description

Cable connector crosses a section of lumpy, wooded topography, winding around and over the root masses and lumpy ground before crossing its namesake half buried mining cables, climbing along an old mine ditch, and joining several other trails at the intersection with the warming hut.

Contacts

Local Club: Swedetown Trails Club

Land Manager: Calumet Township

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

May 27, 2017
Gabriel Johnston

Trail Ratings

  3.0 from 1 vote

#18281

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#274

in Michigan

#18,281

Overall
1 Views Last Month
25 Since Oct 18, 2013
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter