MTB Project Logo

G&S Trolley Trail

 2.0 (1)

1.8 Miles 2.9 Kilometers


Doubletrack

49' 15 m

Ascent

-41' -12 m

Descent

1%

Avg Grade (1°)

4%

Max Grade (2°)

55' 17 m

High

6' 2 m

Low

Shared By ESG Greene

Conditions


Unknown

Getting forecast...

A mostly paved rail trail useful as a connector.

ESG Greene

Dogs Unknown

Features -none-

Description

A straight and short rail trail. It was established in 2009 as a rail trail on a short part of the former line between Westerly, RI and the Thames River in Groton. It was in use by the Groton & Stonington Railway Company using electric trolleys from 1904 to 1928. At its middle there is a bridge over the Amtrak railroad tracks.

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  2.0 from 1 vote

#1

in Groton

#22616

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Rankings

#1

in Groton

#210

in Connecticut

#22,616

Overall
12 Views Last Month
542 Since Jul 12, 2013
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter