MTB Project Logo

A mostly paved rail trail useful as a connector.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.8

Miles

2.9

KM

Doubletrack

55' 17 m

High

6' 2 m

Low

49' 15 m

Up

41' 12 m

Down

1%

Avg Grade (1°)

4%

Max Grade (2°)

Dogs Unknown

E-Bikes Unknown

Description

A straight and short rail trail. It was established in 2009 as a rail trail on a short part of the former line between Westerly, RI and the Thames River in Groton. It was in use by the Groton & Stonington Railway Company using electric trolleys from 1904 to 1928. At its middle there is a bridge over the Amtrak railroad tracks.

Shared By:

ESG Greene

Trail Ratings

  2.0 from 1 vote

#1

in Groton

#37471

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Trail Rankings

#1

in Groton

#294

in Connecticut

#37,471

Overall
1 Views Last Month
1,201 Since Jul 12, 2013
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

All Clear 40 days ago
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.