MTB Project Logo

Reroute of upper Tramway 723, between FS Road 550 and the Colorado Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List

2.2

Miles

3.6

KM

Singletrack

7,672' 2,339 m

High

7,183' 2,189 m

Low

7' 2 m

Up

496' 151 m

Down

4%

Avg Grade (2°)

12%

Max Grade (7°)

Dogs Leashed

E-Bikes Not Allowed

Description

This reroute of upper Tramway 723 was created to eliminate an old steep, rocky road. It lowers the average grade to 3.5%, making it rideable in both directions.

It was machine-made, so berms were created. It includes a nice rock feature, with a few alternate lines, a few with steep rolling drops. Fun and flowy downhill.

It connects to the east end of the Green Mountain Trail and the same lower Tramway. The trail is largely green-blue, with no real technical sections. The old route is closed.

Contacts

Shared By:

Greg Sprenger with improvements by Wendy Sweet and 1 other

Trail Ratings

  4.6 from 7 votes

#7602

Overall
  4.6 from 7 votes
5 Star
71%
4 Star
14%
3 Star
14%
2 Star
0%
1 Star
0%
Trail Rankings

#685

in Colorado

#7,602

Overall
15 Views Last Month
495 Since May 19, 2021
Easy/Intermediate Easy/Intermediate

14%
43%
43%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

All Clear 66 days ago
Add Your Check-In

Check-Ins

Jul 14, 2026
Matthew Goldatein
Jun 18, 2025
Matthew Goldatein
Sep 4, 2024
Matthew Goldatein
Aug 27, 2024
Matthew Goldatein
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.