MTB Project Logo

The main descent from the Cleft Rock parking lot.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.2

Miles

1.9

KM

Singletrack

283' 86 m

High

125' 38 m

Low

51' 16 m

Up

210' 64 m

Down

4%

Avg Grade (2°)

14%

Max Grade (8°)

Dogs Unknown

E-Bikes Unknown

Need to Know

This land is owned by the Pilgrim Nuclear Power Plant and open to the public as a service.

Description

This trail is one of the main descents on the power plant side of the network. Recent trail work has added a number of berms, bridge work, and a large gap jump to start.

Most of the features are built out of non pressure-treated wood, so check the features before riding. The trail ends at the power lines. You can climb back the same trail, take the Water Tower Trail, or ride out to 3A and take the road (or shuttle if you have a friend with a car).

Contacts

Shared By:

Cape Cod NEMBA

Trail Ratings

  4.5 from 2 votes

#8784

Overall
  4.5 from 2 votes
5 Star
50%
4 Star
50%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#83

in Massachusetts

#8,784

Overall
1 Views Last Month
758 Since Apr 24, 2018
Difficult Difficult

0%
0%
0%
50%
50%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started