MTB Project Logo

An old reclaimed trail from the South trailhead to the dam spillway.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.9

Miles

3.1

KM

Singletrack

308' 94 m

High

227' 69 m

Low

92' 28 m

Up

100' 31 m

Down

2%

Avg Grade (1°)

8%

Max Grade (5°)

Dogs Unknown

E-Bikes Unknown

Description

This 2-mile trail (one-way) begins at the South Trailhead and ends at Lake Lurleen Dam. There, it connects to the much longer Tashka Trail. Lakeside Trail is an excellent option for short hikes and as an introductory ride for novice mountain bikers. It is more difficult than the Ridge Trail. There are longer, steeper climbs and some large roots. It is about half singletrack/ half machine benched. It follows the lake shoreline, providing continuous, beautiful scenery. Use caution. The trail is shared by hikers, bikers and bank fishermen.

Contacts

Shared By:

Richard Russell

Trail Ratings

  5.0 from 1 vote

#4009

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#58

in Alabama

#4,009

Overall
2 Views Last Month
218 Since Feb 20, 2013
Intermediate Intermediate

0%
50%
50%
0%
0%
0%

Photos

Impromptu sustainable bike stand
Feb 28, 2013 near Northport, AL
Distances from South trailhead
Apr 15, 2013 near Northport, AL

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started