MTB Project Logo

Connector traverse which leads to the far southwest side of the park.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List

0.3

Miles

0.4

KM

Singletrack

752' 229 m

High

726' 221 m

Low

27' 8 m

Up

19' 6 m

Down

3%

Avg Grade (2°)

5%

Max Grade (3°)

Dogs Leashed

E-Bikes Allowed

Features Commonly Bikepacked · Drops/Jumps · Flow

Family Friendly Even terrain for walking or riding.

Description

Following traversing the leach field section, this alignment features medium turns, rock rolls, a flowy descent with a small rock drop, and eventually climbs and transitions into a more technical section that eventually reaches Chestnut knob.

Contacts

Shared By:

Colin Wurster

Trail Ratings

  5.0 from 1 vote

#4

in Roxboro

#6184

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#4

in Roxboro

#174

in North Carolina

#6,184

Overall
0 Views Last Month
0 Since Mar 6, 2025
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

Photos

Rock roll/feature on new connector.
Nov 7, 2024 near Roxboro, NC

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.