MTB Project Logo

Paint Branch Trail: Fairland Rd - Briggs Cheney

Easy/Intermediate
 3.0 (1)

A great addition to the Paint Branch Trail network. This machine-built trail is fun and flowy.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.5

Miles

2.4

KM

Singletrack

387' 118 m

High

320' 98 m

Low

99' 30 m

Up

55' 17 m

Down

2%

Avg Grade (1°)

5%

Max Grade (3°)

Dogs Leashed

E-Bikes Unknown

Family Friendly New (2021) machine-built singletrack, fun and flowy.

Need to Know

Easy parking on Fairland Road on the opposite side of the creek.

Description

Starting from Fairland Road, the trail begins up the hill away from the the namesake creek. The trail is fast and smooth singletrack winding through the woods above the flood plain. The trail goes underneath Rt 200 and continues up to Briggs Cheney Rd.

A fun segment in either direction with no obstacles to speak of. A good choice for a new rider or family. Also a great addition to a ride on the paved Paint Branch Trail.

Contacts

Shared By:

Chris Irwin

Trail Ratings

  3.0 from 1 vote

#28200

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#451

in Maryland

#28,200

Overall
1 Views Last Month
15 Since Nov 10, 2021
Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none

Stewarded By