MTB Project Logo

Wooden Bridge Road

Easy/Intermediate
 3.0 (1)

A connection between Mt. Sinai and Whitfield Rd.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.3

Miles

3.8

KM

Paved Path

532' 162 m

High

375' 114 m

Low

191' 58 m

Up

242' 74 m

Down

4%

Avg Grade (2°)

10%

Max Grade (6°)

Dogs Leashed

E-Bikes Allowed

Description

Starting on Mt Sinai Rd, head up a gentle slope through mixed hardwood until you summit and slowly head down to the stream crossing. Check out the cool old millstone and head uphill through some lovely forest until you are arrive on Whitfield Road.

Contacts

Land Manager: Duke Forest

Shared By:

Russell Hobart

Trail Ratings

  3.0 from 1 vote

#3

in Duke Forest

#26876

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#3

in Duke Forest

#775

in North Carolina

#26,876

Overall
7 Views Last Month
59 Since Jul 13, 2021
Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none