MTB Project Logo

A trail along the Weymouth Back River.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.5

Miles

0.8

KM

Singletrack

24' 7 m

High

6' 2 m

Low

19' 6 m

Up

3' 1 m

Down

1%

Avg Grade (0°)

3%

Max Grade (2°)

Dogs Off-leash

E-Bikes Unknown

Need to Know

The Boy Scout Bridge is often washed away in heavy coastal storms. The stream can be crossed without the bridge, but you're going to get wet.

Description

This trail breaks off of the Back River Trail: 3A to Wharf St. (Great Esker Trail) to the left at about the 1.55-mile mark. The trail starts out at the Boy Scout Bridge which crosses a salt marsh stream. The trail bears left along the shoreline of the marsh and then curves to the right along the Weymouth Back River and eventually ends at the end of the Back River Trail: 3A to Wharf St. (Great Esker Trail).

Contacts

Shared By:

Shawn Holland

Trail Ratings

  4.0 from 1 vote

#15613

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#163

in Massachusetts

#15,613

Overall
2 Views Last Month
192 Since Apr 15, 2019
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.