MTB Project Logo

greenBlue Sugar River Recreational Trail

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

9.6 mile 15.5 kilometer point to point
Doubletrack
Easy/Intermediate

Elevation

Ascent: 439' 134 m
Descent: -206' -63 m
High: 847' 258 m
Low: 554' 169 m

Grade

Avg Grade: 1% (1°)
Max Grade: 5% (3°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Leslie Kehmeier

Navigate on-trail with our free app

iOS App Store Android App Store

Weather

Getting forecast...

Current trail conditions

All Clear 10 days ago See History

Popular rides nearby

Biked this trail?

Add details to help others plan their adventure.

A circuitous route along the Sugar River.

Leslie Kehmeier

E-Bikes Allowed

Features -none-

Description

The rail trail takes a circuitous route between the historic mill towns of Newport and Claremont, following the Sugar River Valley.

Initially, the route travels through the forest before crossing three trestle bridges. The trail continues again for a few miles and then goes through a series of covered bridges.

The route then jumps back into the woods, intersecting with SR 11/SR 103 before reaching a junction with the Bobby Woodman Trail.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#1

in Claremont

#17695

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#1

in Claremont

#189

in New Hampshire

#17,695

Overall
14 Views Last Month
82 Since May 16, 2018
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter