Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Bridge to Bridge Trail

 5.0 (2)

0.5 Miles 0.7 Kilometers


Singletrack

108' 33 m

Ascent

-32' -10 m

Descent

6%

Avg Grade (3°)

18%

Max Grade (10°)

8,023' 2,445 m

High

7,918' 2,413 m

Low

Shared By D L

Conditions


Unknown

Getting forecast...

This trail connects from Ramsour Road to the Whipple Trail Network below the Midland Railroad Grade.

D L

Dogs Leashed

Features -none-

Description

This is a newly cut (2017) connector from the east end of Ramsour Road near South Main Street to the Whipple Trail Network between town and the Midland Railroad Grade. It serves as an excellent alternative trailhead or a useful connection between Camp Elevation and Whipple Main Route (6031) and other Whipple area trails.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  5.0 from 2 votes

#1038

Overall
  5.0 from 2 votes
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#186

in Colorado

#1,038

Overall
6 Views Last Month
74 Since Mar 15, 2018
Intermediate Intermediate

0%
50%
50%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter