COVID-19: At REI, we encourage you to get outside responsibly. Stay local, avoid recreational travel, practice social distancing and check ahead for area and facility closures. Learn More
MTB Project Logo

Big Field Hill

Intermediate

Trail

0.4 mile 0.7 kilometer point to point
Singletrack
Intermediate

Elevation

Ascent: 96' 29 m
Descent: 0' 0 m
High: 469' 143 m
Low: 372' 113 m

Grade

Avg Grade: 4% (2°)
Max Grade: 11% (6°)

Dogs

No Dogs
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Matthew Kesecker

Going up or going down.

Matthew Kesecker

Electric Mountain Bikes Unknown

Features -none-

The Deer Springs Farm trails are only open to current members of CAMBO. To learn more about becoming a member click here.

Description

Going up or going down, this is the quickest way to or from the back side of the trails.

Biked this trail?

We need help with the following missing trail information:

Family Friendly, ADA Accessible, Need to Know, Features, Electic Mountain Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Stewarded By


Trail Ratings

  5.0 from 1 vote

#3080

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#70

in Virginia

#3,080

Overall
5 Views Last Month
48 Since Jan 8, 2018
Intermediate

0%
100%
0%
0%

Photos

CAMBO Trailhead Parking
Feb 21, 2018 near Culpeper, VA

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter