Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Bow Ridge North Trail

 3.0 (1)

0.5 Miles 0.8 Kilometers


Singletrack

63' 19 m

Ascent

-47' -14 m

Descent

4%

Avg Grade (2°)

9%

Max Grade (5°)

263' 80 m

High

217' 66 m

Low

Shared By Amos Benninga

Conditions


Unknown

Getting forecast...

A nice introduction to the Lynn trails.

Amos Benninga

Dogs Leashed

Features -none-

Closed January to April.

Description

A lot of features but nothing very big, this is a good way to get into Lynn Woods riding. Enjoy easy access from the Powerline Trail East, and this connects you most of the way to Boston Rock. Along the way, there are multiple options for more intermediate trails.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#16614

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#275

in Massachusetts

#16,614

Overall
1 Views Last Month
65 Since Sep 14, 2017
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
100%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter