MTB Project Logo

Rails to River Trail

Intermediate

Trail

3.9 mile 6.2 kilometer point to point
Doubletrack
Intermediate

Elevation

Ascent: 140' 43 m
Descent: -327' -100 m
High: 385' 117 m
Low: 197' 60 m

Grade

Avg Grade: 2% (1°)
Max Grade: 13% (7°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Zain Mirza

A fast and flowy doubletrack.

Zain Mirza

Electric Mountain Bikes Unknown

Features -none-

Description

This trail travels through Lake Fairfax Park, crosses Hunter Mill Road, and continues till it intersects with the CCT at Carper's Farm Way. Consisting of mostly doubletrack, it contains rock gardens and swooping turns, allowing the rider to carry consistent high speeds.

Biked this trail?

We need help with the following missing trail information:

Family Friendly, ADA Accessible, Need to Know, Dogs Allowed, Features, Electic Mountain Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Aug 18, 2019
Timothy Howard
Rode most of the trails in the Fairfax county park near Ricky's place. Working on building endurance and control of my speed/position going downhill. 5.4mi — 2h 37m
Dec 9, 2018
A DiMaria
Aug 15, 2018
Adam Moriarty
Jul 19, 2018
Adam Moriarty
Jul 16, 2018
Adam Moriarty
Mar 31, 2018
Rodrigo Aramayo
Aug 26, 2017
Sunil Gandhi
Aug 19, 2017
Sunil Gandhi

Stewarded By


Trail Ratings

  3.8 from 4 votes

#13247

Overall
  3.8 from 4 votes
5 Star
0%
4 Star
75%
3 Star
25%
2 Star
0%
1 Star
0%
Trail Rankings

#363

in Virginia

#13,247

Overall
42 Views Last Month
828 Since Aug 7, 2017
Intermediate

0%
50%
50%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter