MTB Project Logo

Maintenance Road

Easy
 2.0 (1)

A multi-use doubletrack to take you to all your favourite flow trails.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.7

Miles

1.1

KM

Doubletrack

843' 257 m

High

786' 240 m

Low

57' 17 m

Up

18' 5 m

Down

2%

Avg Grade (1°)

10%

Max Grade (5°)

Dogs Unknown

E-Bikes Unknown

Description

The Maintenance Road commences at the bridge over Spencer Creek and intersects the Round the Lake Trail in two spots. This trail is used by horseback riders, runners, hikers, and your fellow bikers, so make sure to slow down when passing.

This doubletrack trail intersects almost every singletrack trail in the system, so it is a great way to get to all the great trails.

Contacts

Shared By:

Trevor Miller

Trail Ratings

  2.0 from 1 vote

#14

in Christie Lake

#37378

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Trail Rankings

#14

in Christie Lake

#494

in Ontario

#37,378

Overall
1 Views Last Month
17 Since Feb 19, 2017
Easy

100%
0%
0%
0%
0%
0%

Photos

Playing in the snow has never been more fun!
Feb 24, 2017 near Ancaster, ON

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none