Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Swenson

 4.0 (2)

0.2 Miles 0.4 Kilometers


Singletrack

0' 0 m

Ascent

-40' -12 m

Descent

3%

Avg Grade (2°)

7%

Max Grade (4°)

566' 172 m

High

526' 160 m

Low

Shared By Lloyd Blizzard

Conditions


Unknown

Getting forecast...

A short but super fun trail, which lies on a pile of crushed granite.

Lloyd Blizzard

Dogs Unknown

Features -none-

Description

The south end of this trail lies at the quarry end of Rattlesnake and is a continuation of the Redstone Quarry.

At some point in the 1940's, the quarry piled excess crushed granite off to the side, which made a spine that winds through the woods. The trail rides right on top of this grout pile, as some refer to it, and winds through old machinery and historic buildings.

The trail is named for the Swenson family who played a big part in preserving the quarry history.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 2 votes

#7410

Overall
  4.0 from 2 votes
5 Star
50%
4 Star
0%
3 Star
50%
2 Star
0%
1 Star
0%
Rankings

#70

in New Hampshire

#7,410

Overall
2 Views Last Month
44 Since Aug 20, 2016
Intermediate Intermediate

0%
50%
50%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter