MTB Project Logo

Grist Mill Trail

 1 vote

1.7 Miles 2.8 Kilometers


Singletrack

266' 81 m

Ascent

-173' -53 m

Descent

1,769' 539 m

High

1,597' 487 m

Low

5%

Avg Grade (3°)

13%

Max Grade (7°)

Unknown

Update

East Coast singletrack with a little flow.

Ben Voytko

Overview

Description

This trail connects Sumney Road trailhead and camping area to the rest of the system and intersects with the Mill Run Trail at the northern end. There is also a connector with a bridge over Quebec Run to cross back to the Mill Run Trail about 1/2 way.

There is some fast flow when coming from south and heading north, but the trail features sustained climbing in the north to south direction. The loamy soil drains well in wet weather. Expect a few creek crossings from tributaries to Quebec Run.

Contacts

Rate Trail


   Clear Rating

4.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Apr 30, 2017
mikey bauer

Trail Ratings

  4.0 from 1 vote

#6

in Quebec Run

#8615

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#6

in Quebec Run

#366

in Pennsylvania

#8,615

Overall
2 Views Last Month
42 Since Jun 21, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter