Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Powerlines

 3.0 (1)

1.2 Miles 1.9 Kilometers


Doubletrack

15' 5 m

Ascent

-150' -46 m

Descent

3%

Avg Grade (2°)

8%

Max Grade (5°)

471' 144 m

High

336' 102 m

Low

Shared By Jamie Bechta

Conditions


Unknown

Getting forecast...

The doubletrack trail that runs underneath the powerlines; a fun, rocky, and long trail!

Jamie Bechta

Dogs Unknown

Features -none-

Description

A long trail that begins right after the construction site where Rt 16 and 495 cross. This trail follows parallel to 495 all the way across the riding area. It is mostly a doubletrack sand road under the powerlines but briefly dips into the woods to avoid some unrideable terrain. This trail is reasonably hilly but nothing too steep.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 1 vote

#15958

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#256

in Massachusetts

#15,958

Overall
10 Views Last Month
142 Since May 27, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter