Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Tilden Hill-Parcel 5 Connector

 4.0 (1)

0.6 Miles 0.9 Kilometers


Singletrack

58' 18 m

Ascent

-64' -20 m

Descent

4%

Avg Grade (2°)

21%

Max Grade (12°)

950' 290 m

High

890' 271 m

Low

Shared By Robert Allaway

Conditions


Unknown

Getting forecast...

A short fun connector from Tilden Hill Road to Parcel 5

Robert Allaway

Dogs Unknown

Features -none-

Description

This connector is a fun little trail that goes through multiple forests and has several short, fun descents and short climbs. A few log rolls are on this trail as well. Avoid this one on wet days as there are several boggy sections that stay wet for a long time. There is a gorgeous field crossing as well that is particularly nice at dawn and dusk.

To access the trail, ride up Tilden Hill Road until you hit a private drive. Turn right to bypass the private drive and turn right to avoid going down the old remnants of the Class 4 Tilden Hill Road.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#4

in Norwich

#11095

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#4

in Norwich

#176

in Vermont

#11,095

Overall
2 Views Last Month
28 Since May 26, 2016
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter