MTB Project Logo

McIndoe Farm - Parcel 5 Connector Dos

Easy

Trail

0.4 mile 0.6 kilometer point to point
Singletrack
Easy

Elevation

Ascent: 25' 8 m
Descent: -74' -23 m
High: 1,029' 314 m
Low: 954' 291 m

Grade

Avg Grade: 5% (3°)
Max Grade: 17% (10°)

Dogs

Off-leash
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Robert Allaway

Weather

Current trail conditions

Update Conditions
Unknown See History

Navigate on-trail with our free app

iOS App Store Android App Store

A short fork off the McIndoe Farm Parcel 5 Connector that connects to another spot on Parcel 5 .

Robert Allaway

Electric Mountain Bikes Unknown

Features -none-

Description

This is an easy trail, but it can be wet at times. If it's rained recently, the other connector to Parcel 5 is recommended to avoid the swampy sections of this trail.

Biked this trail?

We need help with the following missing trail information:

Photos, Family Friendly, ADA Accessible, Need to Know, Features, Electic Mountain Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#10

in Norwich

#23906

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#10

in Norwich

#314

in Vermont

#23,906

Overall
1 Views Last Month
22 Since May 26, 2016
Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter