Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Red Panther

 4.0 (3)

0.6 Miles 1.0 Kilometers


Singletrack

11' 3 m

Ascent

-10' -3 m

Descent

1%

Avg Grade (0°)

2%

Max Grade (1°)

22' 7 m

High

13' 4 m

Low

Shared By John N Lisa Ayers

Conditions


Minor Issues 34 days ago
Mostly Dry, Some Mud - Trail is very washed out snd debris covered — but nonetheless, rideable History

Getting forecast...

A nice, technical trail with roots, punchy climbs, and nice tight singletrack.

John N Lisa Ayers

Dogs Unknown

Features -none-

This is a one-way trail. Red Panther is usually closed after rain. Park is open from sunrise to sunset.

Description

This is the most difficult trail of Chuck Lennon park. It's a nice technical trail with roots, punchy climbs, and nice tight singletrack. It is not for everyone, but it is a real singletrack and a fun ride. Red Panther is a one-way trail.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Oct 7, 2018
Cameron Schaeffer
Fun trail with punchy climbs and descents, tight corners, and wooden bridges. Should be avoided during the rainy season. 0.6mi

Stewarded By


Trail Ratings

  4.0 from 3 votes

#6978

Overall
  4.0 from 3 votes
5 Star
33%
4 Star
33%
3 Star
33%
2 Star
0%
1 Star
0%
Rankings

#97

in Florida

#6,978

Overall
10 Views Last Month
125 Since Feb 2, 2016
Intermediate/Difficult Intermediate/Difficult

0%
0%
67%
0%
33%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter