Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Commissary Trail

 3 votes

1.3 Miles 2.1 Kilometers


Singletrack

46' 14 m

Ascent

-32' -10 m

Descent

113' 35 m

High

88' 27 m

Low

1%

Avg Grade (1°)

7%

Max Grade (4°)

Unknown

Update

A brief alternate to the River Trail, which detours through scenic wetlands.

Tom Robson

Overview

Sunrise - Sunset
Dogs: Leashed

Description

This trail runs between the River Trail Trailhead parking area, past the Walnut Hill Barn and Walnut Hill Desilting Basin, through some wetlands, and reconnects with the River Trail.

From the parking area at the River Trail, follow the River Trail briefly and look for a trail to the left. Follow this path to the left until it connects to a gravel road, which will be marked with 2 yellow bollards. Turn right on the gravel road. Next up on your right is the entrance to a trail on top of the impoundment. This is part of the Walnut Hill Desilting Basin trail. Ignore it for now and continue on the gravel road.

Continue through the gate and follow the road to the left. As you clear the treeline to your right, there will be a trailhead sign on the right and parking on the left. You may wish to just park here and skip the gravel road section of the trail. The trail goes east into the field. A well-worn path is obvious. It will turn right into the trees on the far side of the berm forming the impounding basin. From here, the path remains obvious but not as well maintained. Be aware of washout and mud. The trail will cross a bridge before turning right and reconnecting with the River Trail, which makes for a very pleasant loop.

An optional extension of this trail follows the power line cut until another connector allows you to turn right to the River Trail or left to the Schuylkill River Trail - Pawlings to Betzwood.

Contacts

Rate Trail


   Clear Rating

3.3 from 3 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  3.3 from 3 votes

#11663

Overall
  3.3 from 3 votes
5 Star
0%
4 Star
33%
3 Star
67%
2 Star
0%
1 Star
0%
Rankings

#522

in Pennsylvania

#11,663

Overall
9 Views Last Month
155 Since Jan 5, 2016
Easy/Intermediate Easy/Intermediate

0%
50%
50%
0%
0%
0%

Conditions



Getting forecast...

Great trail that I used to ride a couple times a week. Its short put has some nice steep technical inclines and decents. Its not very well maintained though. Park in the Betzwood Park parking lot, always parking and real close to the trail head. Sep 24, 2016

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter