MTB Project Logo

Power Lines

 2.0 (3)

2.8 Miles 4.5 Kilometers


Singletrack

412' 126 m

Ascent

-224' -68 m

Descent

4%

Avg Grade (2°)

24%

Max Grade (14°)

769' 235 m

High

474' 145 m

Low

Shared By Glenn Duzy

Conditions


Unknown

Getting forecast...

A smooth singletrack that runs under the power lines with some steep and tough sections.

Glenn Duzy

Dogs Leashed

Features -none-

Open sunrise to sunset.

Description

Sections of this trail have been replaced with a crushed gravel road. The power company is replacing the power line poles.

The trail heads into the woods just off the start of the Newton Brainerd Road. There are a few steep sections that will require you to carry the bike. One near the start of the trail as it starts to head up. The second is near the end of the trail under the power lines. The rest of the trail is generally smooth and non-technical. There are no tree falls or drop offs.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Jan 28, 2018
John Taylor
7.6mi

Trail Ratings

  2.0 from 3 votes

#23180

Overall
  2.0 from 3 votes
5 Star
0%
4 Star
0%
3 Star
33%
2 Star
33%
1 Star
33%
Rankings

#213

in Connecticut

#23,180

Overall
8 Views Last Month
203 Since Sep 29, 2015
Easy/Intermediate Easy/Intermediate

33%
33%
33%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter