MTB Project Logo

Down to the Stream

 4.5 (2)

0.2 Miles 0.3 Kilometers


Singletrack

0' 0 m

Ascent

-135' -41 m

Descent

15%

Avg Grade (9°)

38%

Max Grade (21°)

586' 179 m

High

451' 138 m

Low

Shared By Glenn Duzy

Conditions


Minor Issues 1 day ago
Muddy History

Getting forecast...

This is a steep technical downhill that ends in a skinny ~3 feet above a stream.

Glenn Duzy

Dogs Leashed

Features -none-

No night rides.

Description

This is one of the most technical runs at the reservoir.

It branches off of the River Trail and heads straight down to the stream that runs along the Outer Berm.

The trail is pretty much straight downhill. There are several very rooty sections with ~8-12" steps. The last step is about 12" over a rock with a little ramp to smooth it out a bit. Right after the last step you hit a skinny that starts out about 12 inches wide and narrows to around 9 inches. The skinny is about 3 feet above the water of a small shallow stream.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Jul 15, 2018
John Taylor
9mi — 2h 00m
Jan 28, 2018
John Taylor
Thick hard ice at the bottom, wet with thick mud at top. 7.7mi
Aug 16, 2017
John Taylor
15mi

Trail Ratings

  4.5 from 2 votes

#4647

Overall
  4.5 from 2 votes
5 Star
50%
4 Star
50%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#19

in Connecticut

#4,647

Overall
13 Views Last Month
157 Since Sep 14, 2015
Difficult Difficult

0%
0%
0%
0%
100%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter