MTB Project Logo

A smooth singletrack access trail, bordering Hill St.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List

0.3

Miles

0.5

KM

Singletrack

468' 143 m

High

429' 131 m

Low

23' 7 m

Up

54' 16 m

Down

5%

Avg Grade (3°)

17%

Max Grade (10°)

Dogs Leashed

E-Bikes Unknown

Much of the west side of the gulch has been a recent park expansion for the City of Mukilteo. The city plans to make significant changes to the area to make it more accessible to multiple user groups. As of 2015 the trails remain in a pre-development phase.

Trails are multi-use and traffic should be expected in both directions. Construction and trail maintenance require permission from City of Mukilteo. The center of the Gulch holds the BNSF train line, which is off-limits.

Description

A simple loop that connects the Japanese Gulch Main Trail to Hill Street. The singletrack is smooth but makes a few twists on the north side of the trail. The west side borders a retaining wall before providing access to Hill Street. It is an easy pedal in both directions, although it's generally more of an access trail

The 19th St. Connector or Mukilteo Community Garden Parking would both be better spots to enter the trail network.

Contacts

Shared By:

Eric Ashley

Trail Ratings

  2.0 from 2 votes

#39509

Overall
  2.0 from 2 votes
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Trail Rankings

#996

in Washington

#39,509

Overall
2 Views Last Month
81 Since Aug 17, 2015
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.